# How long does it take to get Power Embedded in my company?

Once the commercial proposal to use Power Embedded has been approved, we will contact you within 16 working hours to schedule the installation of the system, which usually takes between 20 and 60 minutes.

Remember to check that all the prerequisites for installation (topic above) have been met before scheduling the installation.


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://docs.powerembedded.com/faq/general-questions/how-long-does-it-take.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
